Hudeiryat Island - Priority Development Area Network Design
Validation of concept design and system studies/simulation
Detailed design and engineering of LV network up to FP/ST
Distribution substations (GRP) design and engineering
Detailed design and engineering of 22kV network
Preparation of shop drawings
Cable network design
22kV Cable and Switching Station Design at ADAC – Detailed Design and Engineering Works
Power system studies including load flow and short circuit analysis, evaluation of existing circuit configurations and proposed new circuit or modifications.
Preparing optimum cable route layout design of MV power distribution network for newly proposed substation.
Providing detailed civil layouts with sections and specifics.
Grid Power Integration (GPI) Project from ADNOC Gas & ADNOC LNG – Das Island Facility
Analyze possible improvement factors and recommendations to enhance cable current carrying capacity
Study /analysis of route and corridor availability and allocation
Detailed design and engineering of 132kV network
Perform Cable de-rating calculations
Construction of Accelerator Building – Design of Substation 22kV / 0.4kV
Electrical designs covering Protection, lightning protection, equipment sizing, supported by Power systems & Relay coordination study
Precise architectural layouts, including sections and detailed views of substations.
Detailed civil layouts with sections and specifications for substations.
Structural design calculations and drawings for substations.